A certificate of occupancy, or CO, is issued by the city, not the state, so the rules depend on the address. Inside Houston it comes from the Houston Permitting Center. In unincorporated Harris County there is no CO at all; the county issues a Certificate of Compliance instead. Stafford, Sugar Land and the other suburbs each run their own process with their own fees. This page covers when you need one, how the City of Houston process works, what the inspection checks, and how the surrounding cities differ, especially when a business changes owners.
When you need a certificate of occupancy
In the City of Houston, a CO is required before a commercial building, or an individual lease space inside one, may be occupied, and whenever the occupancy classification changes. In practice that means:
- New construction or a newly finished shell space.
- A change of use: a retail space becoming a restaurant, an office becoming a daycare, a store adding a seating area. A different use can trigger different code requirements and usually building permits first.
- A remodel that changes the square footage or the occupant load.
- Moving into a space that has never had a CO for your use.
Once issued, a Houston CO has no expiration date and no renewal. It stays valid until the square footage, the occupant load or the use changes. The original must be posted in a clear, visible place on the premises.
How the City of Houston process works
- Check the space first. The address must have no open permits from other sections, and for an existing building the power must be on for the proposed use before the inspection date. A change of use may need plan review and building permits before the CO application.
- Apply. For an existing building or lease space, the Application for Occupancy Compliance Inspection (Form CE-1045A) is emailed to the Permitting Center's occupancy section, with the lease if there is one.
- Pay. The city emails a link to pay through iPermits. Payment is due the day the application is processed or the inspection is canceled.
- Inspection. After payment the city emails the inspection date and a QR code. Someone must meet the inspector; a no-show adds a re-inspection fee.
- Certificate. Once the space passes, the certificate is emailed to the applicant or their designated agent, with a QR code inspectors scan to verify it. No in-person pickup is needed.
Houston fees
| Item | Current City of Houston fee |
|---|---|
| Occupancy inspection, first story | $537.12, plus $134.28 per additional story; $0.01 per sq ft above 10,000 sq ft |
| Retail or office space under 3,000 sq ft in a multi-tenant building | $268.56 |
| Certificate of occupancy fee | $94.00 |
| Administrative fee (per application) | $33.56 |
| Name change or duplicate certificate | $94.00 |
The city adjusts these fees periodically; we confirm the schedule in effect on the day we file. Building permits for a change of use or remodel are separate and priced by the work.
What the inspector checks
The occupancy inspection confirms the space is safe for the use on the application. Inspectors typically look at exits and exit signs, emergency lighting, fire extinguishers, electrical panels and wiring hazards, restrooms and accessibility. In Houston you also need the job card or receipt on site, a ladder tall enough to reach the attic, and access to every area, including above the ceiling and the roof. Common reasons a space fails are simple: a blocked exit, a missing exit sign, an out-of-date extinguisher or an open electrical panel. Calibre Licensing Services can help you get your certificate of occupancy: we file the application, schedule the inspection and follow up until it is issued.
Outside Houston: county and suburbs
| Location | What you need | Change of owner, same use |
|---|---|---|
| City of Houston | Certificate of occupancy from the Houston Permitting Center | Existing CO stays valid; file a name change |
| Unincorporated Harris County | Certificate of Compliance from the Harris County permits office, after all permits close and the Fire Marshal inspection passes | The Fire Marshal inspects after a change-of-ownership affidavit is processed |
| Stafford | Occupancy application through the city's MGO Connect portal; zoning review, then building and Fire Marshal finals. No temporary COs | New application required |
| Sugar Land | Tenant change of occupancy application through the city portal; building and fire inspections, then a new CO by email | New CO; food businesses must file within 30 days of the ownership change |
Pearland, Missouri City, Katy, Pasadena and the other suburbs each have their own version. The first thing we do on any opening is confirm which office covers the address, because a Houston mailing address does not mean the City of Houston has jurisdiction.
Why the CO comes before your other permits
The CO is the document the rest of the local paperwork leans on. Health departments generally expect a valid occupancy for the use before the opening inspection, and landlords often tie keys or rent start dates to it. When we file a full store package, the CO runs alongside the sales tax permit so neither holds up the other. See every permit a new store needs, our Houston food permit guide and gas station permits.
Official sources
We link to the agencies directly so you can verify every requirement and fee.
- Houston Permitting Center: Certificate of Occupancy
- Houston Permitting Center: Administrative and occupancy inspection fees (PDF)
- Houston Business Portal: Permits and inspections
- Harris County Engineering: Certificate of Compliance
- City of Stafford: New and re-occupancy
- City of Sugar Land: Food establishment change of ownership and occupancy requirements (PDF)
Opening or taking over a space?
Tell us the address and what the business will do. We confirm the jurisdiction and send you a checklist built for that office. Request a consultation or call (346) 767-7855.
Frequently asked questions
Do I need a certificate of occupancy to open a business in Houston?
Yes. The City of Houston requires a certificate of occupancy before a commercial building or an individual lease space in one may be occupied, and whenever the occupancy classification changes. The original certificate must be posted where it can be seen on the premises.
Does a certificate of occupancy transfer when I buy a business in Houston?
Inside the City of Houston, the certificate stays valid unless the square footage, the occupant load or the occupancy use changes, so a buyer running the same kind of business in the same space generally keeps it and can file a name change. Many suburbs are different: Stafford requires a new occupancy application for a change of ownership, and Sugar Land handles new tenants and food business ownership changes through a tenant change of occupancy application.
How much does a certificate of occupancy cost in Houston?
Under the current City of Houston fee schedule, the occupancy inspection is $537.12 for the first story, or $268.56 for a retail or office space under 3,000 square feet in a multi-tenant building, plus the $94 certificate fee and a $33.56 administrative fee. A name change or duplicate certificate is $94. Fees are adjusted periodically, so we confirm the current schedule when we file.
How long does it take to get a certificate of occupancy?
For an existing space with no construction, the City of Houston processes the application and schedules the inspection after payment, and the certificate is emailed once the space passes. A change of use that needs remodeling or building permits takes longer, because those permits and their inspections have to close first.
What does the certificate of occupancy inspection check?
The inspector confirms the space is safe for the proposed use, typically checking exits, exit signs and emergency lighting, fire extinguishers, electrical hazards, restrooms and accessibility. In Houston the power must be on, the job card must be on site, and the inspector needs a ladder and access to every area, including the attic, the space above the ceiling and the roof.
What is a Harris County Certificate of Compliance?
Unincorporated Harris County has no city certificate of occupancy. Instead, the Harris County permits office issues a Certificate of Compliance to commercial buildings that require a Fire Marshal inspection, after all required permits are closed and every inspection, including the Fire Marshal's, has passed. A business cannot open to the public without it.
Can Calibre Licensing Services get my certificate of occupancy?
Yes. We confirm which city or county office covers the address, file the occupancy application, schedule the inspection, and follow up on any corrections until the certificate is issued. Construction, remodeling and physical repairs are handled by your contractor; we handle the paperwork and the inspections.
Last reviewed November 9, 2026. City fees and procedures change; we verify each one with the office at the time of filing.